Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3964.35
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Oct 17, 2023     Canopy lift handle; Canopy skirt positioning and drilling - (2.9 hours)       Category: Canopy
1. Removed the glossy factory powder-coating from the handle that will be my canopy lifting handle. I will have it powder-coated matte black to match the theme of the airplane.

2. My friend Jim once again helped me tape the skirt into position on the airplane.
3. I wanted to get the skirt position exactly right, so I spent a considerable amount of time taking measurements and adjusting the fit of the skirt.
4. Began marking the drilling locations.
5. Drilled and clecoed the first three holes through the skirt, through the pre-existing canopy holes, and into the pre-existing canopy frame holes.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.